One app that grows with your child — here's what's inside.
Small mixed units keep counting, shapes, addition and patterns in balance, and Foxy waits at your child's next stop. Nothing is locked — the order is guidance, not a cage.

Column addition with carrying, subtraction with regrouping, long multiplication and the real long-division bracket — written digit by digit, exactly like the classroom.

Cross Math, Make 10!, Find the Twins, Shape Hunt, Memory Match, Pattern Pop and Balloon Pop — every one of them is arithmetic in disguise, woven into the journey too.

Mastery per skill, weekly consistency, and what needs focus next. The 30-second placement quiz builds a personalized plan before your child's first session.

Real screens from the app — swipe through.








Answer 5 quick yes/no questions — no test for your child. The app finds the right grade and builds a personalized starting plan in 30 seconds.
One guided path from Pre-K to Grade 3 in small mixed units — counting, shapes, column methods, times tables — with Foxy reading everything out loud.
A parent report shows mastery per skill and weekly consistency. Wrong answers become mini-lessons, so mistakes turn into progress.
Practical, teacher-approved explanations — and how the app trains each skill.
The 6-point checklist we'd use as parents — and where most math apps quietly fail.
Read the guide → 🐥Counting to 20, making ten, first addition — and the games that get kids there.
Read the guide → 🦊Fact fluency within 20, tens & ones, and a daily routine that sticks.
Read the guide → ✏️Right to left, carry the 1 — taught exactly like the classroom, digit by digit.
Read the guide → 🖊️When the top digit is too small — borrowing explained the way teachers write it.
Read the guide → 📏Divide, multiply, subtract, bring down — the bracket method, cycle by cycle.
Read the guide → ✖️The smart order (2, 10, 5 first), tricks for ×9, and daily micro-practice.
Read the guide → 🐣Counting, shapes, patterns — playable alone thanks to a fox that reads out loud.
Read the guide → 🎯The age-6 checklist — and a 30-second way to find your child's true level.
Read the guide → 🏡A grade-based spine, school-standard methods and mastery reports for the record book.
Read the guide →